News from the Karumai East Solar
-
May 31st, 2019Construction of the substation equipment is progressing.
-
Apr 30th, 2019Construction of the substation is progressing, and equipment is being installed.
-
Mar 31st, 2019Construction work to lay the foundations for the substation has been completed.
-
Feb 28th, 2019There has been little snowfall, and the installation of panels is progressing steadily.
-
Jan 31st, 2019Snow is being shoveled as needed, and cabling is being installed in flat and even areas. The cold weather is challenging, but work is proceeding as scheduled thanks to the efforts of those working on-site.
-
Dec 31st, 2018Pouring of concrete for the retention basins is progressing.
-
Nov 30th, 2018Installation of sub-substation equipment is progressing.
-
Nov 15th, 2018(Additionally) Pictures drawn by children from nearby preschools added a splash of color to the site.
-
Oct 31st, 2018Laying of cables operated by RENOVA on the power plant premises is progressing.
-
Sep 30th, 2018Laying of cables operated by RENOVA—which will connect the power plant to the grid connection point—is progressing.