Kanda Biomass

Apr 30th, 2019

Concrete Poured for Fuel Tank Base

 

April 2019: Concrete pumping trucks (red) are being used to pump and pour fresh concrete received from the concrete mixer trucks (cream) at the edges of the photograph.

Kanda Biomass Under Construction